(2) office in Heze City Water Conservancy Bureau two floor building center room set management center of the whole system;
(3): three link transit terminal installation in the vicinity of the Zhaowang River along the waters 13 bridges have mobile tower,wireless internet security cameras.
(1) the entire area length of about 20 km.
in order to promote the informatization project schedule Zhaowang River waters and to strengthen the safety management, combined with the actual situation of the waters of the river; water level monitoring, water pollution monitoring, and illegal fishing problem management. The Zhaowang River waters to provide video surveillance system, and to integrate the new monitoring system, video monitoring system of the Yellow River road and Kunming Road water pumping station and the king of Zhao River waters. According to the river the reality of the environment, cause wide drainage, water bending,2014 dome cctv camera, bridge, construction difficulties, the wireless monitoring transmission scheme.
2
(6) equipment installation and the height
the design of the wireless devices are built-in antenna,hidden wireless security cameras, convenient installation and debugging, this project relates to place more, the environment may be more complicated,2014 solar wireless security camera, equipment installation height must be higher than the trees and houses, mountains etc..
1, project
3, system design (with map)
(2): two link transit terminal installation tower in the vicinity of Heze City Water Conservancy Bureau 100 meters television,2013 cctv camera repair.
(4) water pumping station to the integration of the Yellow River road and Kunming road.
design scheme adopts relay scheme: the middle block,2013 internet security camera systems, relaying the past, avoid obstacles.
(4): the transmitter mounting Zhaowang River waters monitoring camera pole (camera distance can be added to the switch, a little more cameras note: cable horizontal distance shall not exceed the theoretical distance of 70 meters, or need to add the switch signal amplification, prevent the signal attenuation).
, program analysis(3) is arranged in the middle of the river basin bridge on both sides of the Zhaowang River bridge monitoring points,dvr security camera systems, for a total of 13 bridges,2013 panasonic security cameras, the starting point is the southernmost of the bridge in the road, the total gate end point is the northernmost Zhaowang River reservoir.
(5) the method of front camera by millions of high-definition digital cameras,2013 wireless receiver for pc, digital hard disk video recorder form, so the front camera occupied bandwidth are in the 4 - 8Mbps. Such as in accordance with the actual each point 2 monitor head calculation, each point of up to 20Mbps bandwidth, so the regional need bandwidth is about 40Mbps, according to the design bandwidth enough surplus, equipment used in broadband 5.8GHz wireless devices.
Waters ofwireless monitoring transmission scheme of
with multiple cameras scheme: a transmitting device with a plurality of close range camera.
(1) primary link receiver: Heze City Water Conservancy Bureau is mounted on the roof water conservancy bureau office building,outdoor security cameras wireless.